vMix Forums
»
General
»
GT
»
Word Time - multiple clock
Rank: Newbie
Groups: Registered
Joined: 4/18/2020(UTC) Posts: 2 Location: Windsor
|
Hi Thanks for the excellent software
I would like to use excel function to display multiple time I have used google sheets with forumla =now()+1/24 but the datasource manager is not synchronisng the data every minute. Is there ability do it with in vmix?
Thank you
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 12/27/2012(UTC) Posts: 5,243 Location: Belgium Thanks: 294 times Was thanked: 960 time(s) in 794 post(s)
|
Using datasources works when the source is updated ( saved) regularly
there are 2 production clocks that you can create an input from ( with time offset)
scripting would also be an option if you need several different ones
|
|
|
|
Rank: Newbie
Groups: Registered
Joined: 4/18/2020(UTC) Posts: 2 Location: Windsor
|
@doggy thanks for the reply, but its not straight forward
I am looking for configurable time for GT Design with different time zones.
|
|
|
|
vMix Forums
»
General
»
GT
»
Word Time - multiple clock
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
Important Information:
The vMix Forums uses cookies. By continuing to browse this site, you are agreeing to our use of cookies.
More Details
Close