vMix Forums
»
General
»
General Discussion
»
Production Clock for starting the stream/record
Rank: Member
Groups: Registered
Joined: 4/6/2017(UTC) Posts: 16 Location: Adelaide, SA Thanks: 4 times Was thanked: 1 time(s) in 1 post(s)
|
Hello all!
Can the start and end times of a event set up in the production clock be used as triggers for starting/stopping a stream/record?
As far as I can tell, the trigger 'OnCountdownCompleted' refers to the countdown inside a title.
I want to have a project set up that starts a stream based on the time so I wouldn't have to be present when it needs to go live. Basically when the event(Production Clock Event) starts, I would want it to trigger the stream and record to start and trigger a video to start playing. Then on the completion of the video the stream and record will stop (which I can do with triggers on the video).
I often forget to hit record at the start of a stream because I'm trying to coordinate so many things at once so being able to have it automatically record would be nice.
Cheers.
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 8/21/2017(UTC) Posts: 319 Location: Uk
Thanks: 26 times Was thanked: 33 time(s) in 29 post(s)
|
no just record a blank video 5/10 mins long then mark out the time you want it to finish per production with an on completion instruction x
|
|
|
|
vMix Forums
»
General
»
General Discussion
»
Production Clock for starting the stream/record
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
Important Information:
The vMix Forums uses cookies. By continuing to browse this site, you are agreeing to our use of cookies.
More Details
Close